Sunday, December 8, 2013

Measurement 5

Lecturer : Mr Ramar Subramaniam and Sr. Chee Wai Meng

This module covers the measurement of M&E (Mechanical and Electrical) as well as C&S (Civil and Structural) works. Introduction on the principles of specification writing, form of specification writing and their application in various trades are taught in the module. 


Scope of learning :
- M&E :  
     1. Electrical Installation
     2. Cold Water Installation
     3. Sanitary Installation
     4. Fire Protection
     5. Air Condition

- C&S :
     1. Excavation & Earthwork
     2. Environmental Protection & Enhancement ( Sediment Basin)
     3. Traffic Management & Control 
     4. Site Investigation Work (Deep Boring)
     5. Demolition & Site Clearance
     6. Geotechnical Work (Retaining Wall)
     7. Railtrack 
     8. Concrete Work of Prestressed Concrete


ASSIGNMENT 
A group which consists of 6 persons was required to prepare a complete measurement including the Bill of Quantities of the area and volume of the site clearance. 

Through this assignment, I am able to understand and use the following formulas:Area = D/3*(K+2L+4M), where,  

D = distance between offsets   
K = sum of first and last ofsets   
L = sum of remaining odd offsets   
M = sum of even offsets